Licensed Florida GC · Structural PE On Staff · 3 Counties

Foundation Repair
Contractor Miami

Post-tensioned slab repair, helical pier underpinning, sinkhole remediation, and grade beam restoration. Bonded GC. Florida-registered PE. Engineer-stamped from structural assessment through county permit closeout.

Miami-Dade · Broward · Palm Beach · SB 4-D Findings · DOD Performance on Record

PT Slab
Cable & Anchor Repair
50+ yr
Repair Design Life
PE Stamped
Every Project
1 GC
Assessment to Closeout
Licensed Florida GC
Bonded & Insured
Structural PE On Staff
Florida-Registered, Not Subcontracted
Post-Tensioned Specialists
PT Slab · Cable · Anchor Systems
DOD Performance on Record
U.S. Army Reserve — Arcadia FL
SB 4-D Findings
Engineer + GC + Permit — One Contract

The Problem

South Florida Foundations Fail Differently.

South Florida's combination of organic coastal soils, karst limestone, a water table that sits 2–4 feet below grade, and a post-tensioned slab inventory that dominates the high-rise market produces foundation failures that don't occur in most of the country.

Identifying the failure mechanism — not just the visible crack or settlement — determines the correct repair. Surface patching a PT cable failure or grouting over an organic soil subsidence problem does not resolve the finding and will not satisfy a county closeout.

SB 4-D Foundation Findings

When a milestone inspection identifies foundation deficiencies — grade beam spalling, rebar corrosion, or PT cable failure — BAM carries the structural engineer of record, pulls the repair permit, and delivers the county-accepted closeout that formally resolves the finding. One contract. No owner coordination between engineering and contracting firms.

Repair Method Load-Transfer Capacity

Helical Pier Underpinning Structural
Compaction Grouting Void Fill
Surface Crack Repair Cosmetic

REPAIR DESIGN SERVICE LIFE

Helical pier underpinning (PE-designed)50+ years
Pressure grouting — karst voids25–40 years
Surface / crack-only repair5–15 years

Repair Scope

What BAM Repairs.
What BAM Permits.

One bonded GC contract covers structural assessment, PE-stamped drawings, permit procurement, and county-accepted closeout — no handoff between engineer, contractor, and permitting agent.

High-Rise / Mid-Rise

Post-Tensioned Slab Repair

Broken PT cable replacement, anchor head repair, corrosion-inhibiting grout injection, and void filling under live post-tensioned decks. The most common foundation failure in South Florida's coastal high-rises.

Settlement Correction

Helical Pier Underpinning

Driven helical pier systems for settlement correction and load transfer to competent bearing strata. PE-designed to site-specific geotechnical data — not a standard depth chart from a catalog.

Concrete Restoration

Grade Beam Restoration

Spalling repair, rebar corrosion treatment, concrete jacketing, and full section replacement on grade beams and foundation walls. Includes chloride profiling to confirm repair extent before scope is finalized.

Karst / GPR Confirmed

Sinkhole & Void Remediation

Compaction grouting and pressure grouting for karst voids, dissolved limestone cavities, and organic soil subsidence. Ground-penetrating radar confirmation included before and after remediation.

Below-Grade

Foundation Waterproofing

Positive-side and negative-side waterproofing systems, crystalline admixture treatment, and drainage board installation. Critical for slabs-on-grade in South Florida's high water table environment.

Load Path Repair

Pile Cap & Pedestal Repair

Concrete restoration and rebar treatment on pile caps, column pedestals, and load-transfer elements. Includes bearing pad replacement and epoxy grouting for column base plates where load path requires it.

Diagnosis

Failure Mechanism First.
Then the Repair Scope.

South Florida's geology produces failure modes that require site-specific investigation before any repair scope is finalized. The mechanism determines the method.

Common Failure Mechanisms

PT Cable Stress Corrosion
Chloride-induced fracture — no visible warning
High-Rise
Organic Soil Subsidence
Muck / peat compression under sustained load
Coastal Plain
Karst Void Formation
Limestone dissolution — invisible until collapse
GPR Required
Adjacent Dewatering
Water table drop consolidates buoyant organics
Legal Scope

Investigation Methods BAM Uses

Soil Borings
Organic layer depth, bearing capacity, SPT data
Standard
GPR Void Scanning
Pre- and post-grouting subsurface confirmation
Karst Sites
PT Cable Sounding
Cable-by-cable assessment, anchor inspection
PT Slabs
Chloride Profiling
Confirms repair extent before scope is finalized
Concrete

Our Process

Assessment to
Final Inspection

One licensed GC manages every phase. One permit. One engineer of record. One closeout package.

1

Geotechnical & Structural Assessment

Florida-registered PE reviews as-built drawings, performs on-site survey, and coordinates soil borings for bearing capacity and organic layer depth. For PT slabs, cable mapping and anchor inspection are included. The assessment identifies the failure mechanism — not just the visible symptom.

2

PE-Stamped Repair Design

Structural drawings produced in-house — not outsourced to a third-party engineer. For underpinning, design includes pier layout, load schedule, and installation sequence to protect occupied structures from differential settlement during the repair phase.

3

Permit Procurement

BAM submits to the county building department as the licensed GC and permit applicant. For sinkhole remediation, FDEP notification may apply. The owner does not interface with the building department — BAM manages all RFI responses and plan revisions through final approval.

4

Phased Repair Execution

For occupied structures, repair is sequenced to maintain safe access and structural load paths throughout construction. PT cable replacement is performed in live-load stages with PE observation at each tendon sequence. Settlement monitoring logs are maintained and delivered at closeout.

5

Engineer Certification & Closeout Package

PE certifies completed repairs per stamped drawings. County final inspection obtained. Closeout package includes permit sign-off, PE compliance letter, as-built drawings, test reports, warranty, and lien waiver — delivered to the property manager and uploaded to the county portal where required.

Regulatory

Three Counties.
One Bonded GC.

Foundation repair permit requirements vary by county. BAM holds active licensure and permit history across all three South Florida counties and knows each regulatory layer before the application is submitted.

Miami-Dade County

SB 4-D foundation scope — 25-year coastal threshold. DERM review for sites near tidal canals. Miami limestone karst risk — GPR investigation is standard practice before grouting.

+ PT slab permit experience
+ NAVD88 grade beam elevation docs
+ DERM / WASD coordination
Broward County

SB 4-D — 25-year coastal / 30-year inland milestone threshold. Broward Building permit experience for foundation repair. SFWMD coordination for sites with drainage system impact.

+ Organic soil subsidence mapping
+ Fort Lauderdale waterway review layer
+ SFWMD coordination where applicable
Palm Beach County

SB 4-D 30-year inland threshold — most PBC properties. Intracoastal proximity adds SFWMD ERP layer. Loxahatchee area carries elevated organic soil settlement risk.

+ Palm Beach County Building permit
+ Federal market: SAM.gov registered
+ Miller Act bonded for federal scope
SB 4-D Milestone Inspection Findings

When a milestone inspection finds foundation deficiencies — grade beam spalling, rebar corrosion, PT cable failure — the county requires a licensed GC to pull the repair permit and deliver a PE-certified closeout package. A specialty repair contractor cannot satisfy that requirement. BAM is licensed, bonded, and carries its own structural PE — one contract resolves the finding from assessment through county sign-off.

Why BAM

One GC. Engineer on Staff.
DOD Performance on Record.

9,400
SF DOD Project Delivered
U.S. Army Reserve armory, Arcadia FL. CPARS performance documentation on file.
3
County Jurisdictions
Active permit history across Miami-Dade, Broward, and Palm Beach.
PE
Stamped on Every Job
Florida-registered structural PE assesses, designs, and certifies every foundation repair.
SAM
Registered & Miller Act Bonded
SAM.gov current. Surety bond capacity for federal foundation contracts over $150K.

FAQ

Common Questions

Post-tensioned cable stress corrosion cracking is the most common structural foundation failure in South Florida mid- and high-rise buildings. PT cables are highly susceptible to chloride-induced corrosion in coastal environments — the failure gives no visible warning and presents as sudden cable fracture under load. A building that passes a visual inspection today can have an active tendon failure within 60 days. Only cable-by-cable sounding and anchor head inspection identifies at-risk tendons before failure occurs.

Structural foundation repair in Florida requires a licensed General Contractor (CGC or CBC) as the permit applicant. A specialty contractor cannot pull the building permit for structural work. When SB 4-D milestone inspections identify foundation deficiencies, the county requires a licensed GC to pull the repair permit and deliver PE-certified closeout documentation. BAM is licensed, bonded, and carries its own structural PE — we satisfy all three phases under one contract without the owner coordinating between separate firms.

Yes — helical pier underpinning is one of the few foundation repair methods that can be performed in occupied structures. The installation equipment is compact, vibration is low, and piers are installed in a sequenced pattern that keeps the structure stable throughout. Our PE designs the installation sequence to maintain load path integrity at every stage. Settlement monitoring logs are maintained throughout construction and delivered as part of the closeout package. Access is limited to the work zone — residential units or commercial tenants above are not required to vacate.

Karst void remediation starts with ground-penetrating radar (GPR) to confirm void location, depth, and extent before any grouting begins. We use compaction grouting to fill existing cavities and consolidate loose overburden — no excavation required, no need to remove the structure above. Post-grouting GPR confirms void closure before the engineer certifies the repair. For sites near Biscayne Bay or tidal waterways, FDEP notification may apply. BAM prepares and manages all regulatory submittals as part of the project scope.

The BAM closeout package includes: county final inspection sign-off, PE compliance letter certifying repairs per stamped drawings, as-built drawings, all material test reports (concrete cores, grout strength, etc.), settlement monitoring logs (for underpinning projects), contractor warranty, and a fully executed lien waiver. For SB 4-D milestone findings, the package is formatted to satisfy the county's requirement for formal resolution of the inspection deficiency. For insurance claim-driven repairs, we can structure the documentation to support the insurer's claims process.

Get Started

Request a Foundation Assessment

PE-reviewed within 1 business day. Failure mechanism, repair scope, and permit timeline at no obligation.

Inquiry Received

Our structural team will review your project and respond within 1 business day.

Questions? Call (941) 204-3306

Please enter your name.
Please enter a valid email address.
Provide at least 15 characters of project detail.

Licensed · Bonded · PE On Staff · No Obligation

Licensed · PE Stamped · SB 4-D Findings · DOD Performance

Foundation Settlement
Needs a Bonded GC.
Not a Patch Crew.

A specialty contractor can fill a crack. Only a licensed, bonded GC can carry the structural engineer of record, pull the foundation repair permit, and deliver the county closeout package that resolves a milestone finding or satisfies an insurance claim requirement.

SAM.gov Registered · Miller Act Bonded · DOD Performance Record

Request Foundation Assessment