Brick and Mortar Company — Seawall · Marine Remediation · Coastal Structural Engineering · Pompano Beach FL
Seawall · Marine Remediation · Coastal Structural

Institutional construction discipline for coastal properties that need to outlive the sea.

Brick and Mortar Company delivers seawall, bulkhead, and marine remediation engineered end-to-end — inspection, structural design coordination, permitting, self-performed construction, and Engineer-of-Record countersigned close-out. Palm Beach to the Florida Keys.

Seawall
Bulkhead & marine remediation
Inspection
250-point full assessment
Permitting
CCCL & agency coordination
Structural
EOR coordination & QA
Masonry
Concrete & block restoration
AI Detection
Proprietary damage scan
Services

Practical engineering-grade delivery — from inspection to close-out.

Six practice areas structured around the reality of Southeast Florida coastal ownership. Each scope is estimated with dimensional take-off, executed under an engineered plan set, countersigned by the Engineer of Record at every critical phase, and documented in a weekly written progress report.
01
Seawall & Bulkhead Remediation
Structural remediation of failing waterfront walls — cut-out repair, engineered dowel-in reinforcement, Sika chemistry protocol, formwork, and marine-exposure concrete pour under Engineer of Record sign-off.
  • Panel-by-panel damage classification with AI-detector overlay
  • #5 / #6 epoxy-coated rebar per ASTM A775 · Sika AnchorFix-3001 · 4-4-4 clean protocol
  • Sika Armatec 110 EpoCem & SikaTop 123 Plus rebar-corrosion protection
  • ACI 318-19 marine C2/S1/F2 · 5,000 psi concrete · w/cm ≤ 0.40
02
Coastal Structural Engineering & Inspection
Site-preparation and structural inspection reports formatted for engineer-of-record coordination, municipal filing, insurance-carrier submission, and HOA board packet review.
  • 250-point full structural assessment with photographic condition register
  • AI damage-detection scan across every panel · rust · spall · crack · void classification
  • Non-structural classification & site-preparation determinations for permit exemption
  • Written reports formatted for property manager, EOR, municipal, and carrier submission
03
Permitting & Agency Coordination
Coastal Construction Control Line coordination, Town of Palm Beach / municipal Building Department coordination, FDEP sediment-control coordination — permitting is a deliverable, not an obstacle.
  • CCCL applicability determinations coordinated with the engineer of record
  • Municipal site-work / grading / structural permit routing
  • FDEP silt-fence and floating turbidity-barrier BMP compliance
  • Owner-authorization letters and permit-tracking documentation
04
Concrete & Masonry Remediation
Structural concrete cut-out, chip-back, and repair for footers, pathways, retaining walls, and pool decks — including CBS block partial-demolition and rebuild coordinated with the coastal scope.
  • Footer damage repair — cut-out, dowel drill + epoxy set, formwork, monolithic pour
  • CBS retaining wall partial demolition and rebuild per engineered plan set
  • Reinforced concrete pathway construction (waterfront-cap tie-in)
  • Multi-cell subsurface drainage using hydro-reduction methodology
05
HOA & Condo Association Coastal Assets
Board-facing coastal-asset delivery — engineered scopes, live client portal per project, weekly written progress reports, and change-order traceability formatted for board review and reserve-study alignment.
  • Board packet-ready inspection reports with priority-ranked scope recommendations
  • Live client portal with phase timeline, document register, and activity log
  • Change-order approval workflow with verbal-to-written escalation trail
  • Reserve-study alignment · draw-schedule structuring · milestone sign-off letters
06
AI Damage Detection & Preventative Maintenance
Proprietary computer-vision damage-detector scans your seawall photos and auto-classifies defects with pixel-level overlay — paired with a bi-annual maintenance program that catches failures at year one.
  • Rust · spall · crack · void auto-classification with area-weighted repair estimates
  • Pre-purchase due-diligence scans for coastal-property buyers
  • Bi-annual preventative maintenance inspections · post-king-tides + pre-summer
  • Sika Antisol E cure-and-seal on exposed faces · corrosion-inhibitor annual re-coat
Representative Work

Every project is traceable to a document, a signature, and a date.

Active and recent engagements across Palm Beach and Broward. Every entry carries a project register, weekly written progress reports, Engineer of Record countersignatures at critical milestones, and a live client portal accessible to Building Management, owners, and the engineer of record.
/ 01
220 Banyan Rd · Seawall & Retaining-Wall Remediation Palm Beach, FL · Building Management · Est. #PB-2026-173
47 LF bulkhead reconstruction · 108 LF reinforced concrete pathway · CO-001 footer damage repair (41 sq ft) · CO-002 65.69 sq ft seawall damage repair
Active · Week 3 of 5+
/ 02
Nassau House Tower 6 · Sidewalk & Curb Restoration Nassau House · HOA-driven sidewalk + curb appeal remediation
Multi-phase sidewalk restoration, curb repair, and photo-catalog documentation for HOA board approval sequencing
In Delivery
/ 03
Mar-a-Lago · Seawall Prospect Palm Beach · Confidential engagement · local-file only
Coastal-asset scope under NDA · not disclosed publicly · engagement details available under executed NDA
Confidential
/ 04
220 Banyan Rd · Optional Cap Extension Palm Beach, FL · Est. #PB-2026-175 · upgrade proposal
1' × 108 LF cap extension · 108 sq ft added · Level VII finish · poly-turf inlay · elective upgrade
Proposed
/ 05
220 Banyan Rd · Dock Restoration Proposal Palm Beach, FL · Est. #PB-2026-174 · PB-2026-174 · labor-only
8-item scope · rail full R&R · cross-member reinforcement · valid through October 11
Proposed
The BAM Approach

Four movements. Every project. No exceptions.

Class-A construction management scaled to residential coastal assets. Every scope is estimated, engineered, countersigned, and delivered under the same four-movement discipline — whether the seawall is on Ocean Boulevard, Biscayne Bay, or the Overseas Highway.
01
Assess
On-site inspection by certified concrete inspector with AI damage-detector overlay. Written condition register, photo documentation, defect classification, and priority-ranked scope recommendation.
02
Engineer
Coordination with the Engineer of Record. Take-off agreement issued with dimensional scope, Sika chemistry protocol, marine-exposure concrete spec, and CCCL / municipal permit routing.
03
Execute
Self-performed demolition, rebar, formwork, and pour under weekly written progress reports and Engineer-of-Record countersign at every critical milestone — pre-pour QA, post-pour, and close-out.
04
Deliver
Owner walkthrough with photo record, final EOR sign-off letter, and reserve-study alignment for HOA-owned assets. Live client portal remains published for the record after project close-out.
Credentials

Engineering, contracting, and marine-remediation authority — coordinated under one roof.

Brick and Mortar Company is a Florida-registered contractor operating under qualified Florida-licensed General Contractor partnerships for permitted scope. We self-perform concrete, waterproofing, marine coatings, and structural remediation under that partnership.

Insurance
Insured · General Liability
Waterfront / marine-scope coverage current
Florida Registration
Florida Certified
Qualified GC-partner arrangement for permitted scope
Milestone
First FL 3DCP Deployment
September 2019 · State of Florida on record
Engineer of Record
Coordinated per Project
Structural coastal PE assigned per engagement
Method

The B · M · L · E · A · P framework.

Institutional structure modeled after BIG / Bjarke Ingels Group. Six practice letters, one integrated firm. Every project passes through the letters it needs — nothing gets outsourced to a third party we have not countersigned.
B
Brick
Structural systems · masonry · cladding · marine envelope
M
Mortar
Interior finishes · FF&E · owner-facing spec
L
Landscape
Coastal public realm · ecology · stormwater · biophilia
E
Engineering
Structural · MEP · civil · coastal / marine · sustainability
A
Architecture
Design · documentation · CA · code compliance
P
Planning
Zoning · entitlement · urban design · masterplan
Coverage

Palm Beach to the Florida Keys. One firm.

Same crew. Same standards. Same institutional discipline whether the waterline is on Ocean Boulevard in Palm Beach, an Intracoastal peninsula in Fort Lauderdale, an island in Biscayne Bay, or the Overseas Highway through the Keys.

Palm Beach

Palm Beach County
  • Palm Beach · West Palm Beach
  • Jupiter · Juno Beach
  • Palm Beach Gardens
  • North Palm Beach
  • Boca Raton · Highland Beach
  • Delray Beach · Boynton Beach
  • Manalapan · Ocean Ridge

Broward

Broward County · HQ
  • Pompano Beach · HQ001
  • Fort Lauderdale
  • Deerfield Beach
  • Lauderdale-by-the-Sea
  • Lighthouse Point
  • Hollywood · Hallandale Beach
  • Sea Ranch Lakes · Dania Beach

Miami-Dade

Miami-Dade County
  • Miami Beach
  • Bal Harbour · Bay Harbor Islands
  • Sunny Isles · Golden Beach
  • Key Biscayne · Fisher Island
  • Coconut Grove · Coral Gables
  • Aventura
  • Star Island · Palm Island

Florida Keys

Monroe County
  • Key Largo · Tavernier
  • Plantation Key
  • Islamorada
  • Marathon
  • Big Pine Key
  • Summerland · Cudjoe · Sugarloaf
  • Key West
Contact

Tell us what you are protecting.

We respond to every inquiry within one business day. For active-failure emergencies — undermining voids, exposed rebar, panel movement, or leaks during a tidal window — call (844) SEA-WALL directly for same-day dispatch.

Direct Line
(844) SEA-WALL
(1-844-732-9255)
Office
301 N Ocean Blvd
Pompano Beach, FL 33062
Hours
Monday – Saturday
7:00 AM – 7:00 PM ET · Emergency dispatch outside hours
Start a Project
Response within one business day · Same-day for emergencies