Engineered. · 844SEAWALL
The Seawall

Engineered.

Built the way a bunker is built. Measured in millimeters. Signed & sealed by hand. Delivered on time.

Scroll
Introducing

A new standard for Florida coastal engineering.

Three disciplines working as one system. Material science. Field execution. Institutional record-keeping. Nothing is improvised; every detail is designed.

01 · Pour

The materials chapter.

5,000 psi marine mix. Migrating corrosion inhibitor at batch. Epoxy-coated reinforcement. Cure-and-seal on finish. The compound stays stable for fifty years.

02 · Phase

The execution chapter.

Eight phases, countersigned in sequence. The Engineer of Record releases each phase before the next can begin. Nothing advances without a signature.

03 · Portal

The record chapter.

A live Owner-facing portal updates the same day each pour is placed. The Weekly Progress Report lands every Monday. Everything is traceable; nothing is forgotten.

The features

Six disciplines. One wall.

Each discipline is independently specified, independently tested, and independently signed off. Together they constitute a single structural argument with the Atlantic.

01 · Mix
Marine-grade concrete.
ACI 318-19 C2 exposure. Water-to-cementitious ratio under 0.40. Sika FerroGard 903+ migrating corrosion inhibitor dosed at batch.
5,000psi
02 · Steel
Epoxy-coated reinforcement.
ASTM A775 Grade 60 epoxy-coated bar on 8-inch centers. Mill certs filed, lap-splice verified by the EOR before the pour window opens.
#5@ 8"
03 · Anchor
Tie-back.
Steel rod driven 10 feet into dry-land deadman. Transfers lateral load off the wall and into the earth behind it.
10ft dead
04 · Drainage
#57 stone + weep.
A drainage field behind the wall. Hydrostatic pressure never has a case to make.
0psf residual
05 · Cap
Monolithic finish.
A single-batch cap pour over the full run. No cold joints. Broom-finished for traction, cured and sealed for salt.
24" width
06 · Portal
Live Owner-facing record.
Every pour, every photograph, every change order updated same-day. The institutional discipline of a Fortune-500 project, running on your coast.
Pours
Tracked daily
Weekly Reports
Mondays, 8 AM ET
Signatures
EOR + Owner
Up close

Measured in millimeters.

Every element of the section is drawn, dimensioned, and tolerated. The engineering is not decoration. It is the structure.

CAP · 24" × 7" T
#5 @ 8" O.C.
TIE-BACK · 10' DEAD
#57 STONE DRAINAGE

Section B-B · typical 30-ft Florida seawall · drawn to scale · signed by the Engineer of Record

Specifications

The sheet, from cover to anchor.

Everything that ships on a BAM Take-Off Agreement. Nothing proprietary; everything traceable to a published standard.

Mix strength
5,000psi
Marine-grade · ACI 318-19 C2 exposure class · w/cm ≤ 0.40.
Reinforcement
#5@ 8"
ASTM A775 epoxy-coated Grade 60 bar · 8-inch on-center mat.
Tie-back anchor
10ft
Steel rod to inland deadman · transfers lateral load off the wall.
Cap profile
24in W
Monolithic cap · broom finish · cure-and-seal applied immediately.
Corrosion inhibitor
903+
Sika FerroGard migrating inhibitor · dosed at batch per TDS.
Cure & seal
Antisol E
Spray-applied post-finish · 7-day moisture retention + UV cover.
Design life
50+ yr
Engineered to outlast the mortgage, then the grandchildren.
EOR sign-off
Every phase
Engineer of Record countersigns each gating phase before release.
Begin

The best time to build was last decade.
The second best is now.

A licensed, insured team walks your waterline with you, measures, writes it up, and prices it. The scope lives in a sealed Take-Off Agreement; the price never moves without your signature.

1·844·732·9255 call@844seawall.com Palm Beach → Florida Keys