Miami-Dade & Broward • NOA-Compliant Systems • Bonded GC • Engineer-Stamped Closeout
Stucco Contractor Miami-Dade Permitted. NOA-Compliant. Building Envelope Closed.
BAM Construction is a licensed, bonded Miami-Dade general contractor delivering stucco restoration and building envelope repair, three coat systems,Miami Dade NOA compliant products, and full structural substrate repair — for HOA boards, condo associations, and developers across Miami-Dade and Broward County.
Stucco failure in South Florida is rarely cosmetic. Water infiltration through failed stucco is among the most common drivers of rebar corrosion, CMU deterioration, and structural findings on buildings reaching 25-year and 30-year milestone inspection thresholds. A painting contractor applying a fresh coat does not stop the failure — it hides it.
Request a Stucco Scope AssessmentOn site within 48 hours • Board-ready scope and budget • Phased schedule available for occupied buildings
Licensed Florida GC
Bonded & Insured
Miami-Dade NOA Products
High-Wind Zone Compliant
Structural Substrate Repair
Not Surface Coating Only
Structural Engineers On Staff
Licensed & Florida-Registered
Miami-Dade • Broward
48-Hour Assessment
Florida SB 4-D — Building Envelope Scope
Failed Stucco Is a Water Intrusion Problem, Not a Paint Problem
South Florida’s combination of salt air, UV exposure, thermal cycling, and hurricane-season wind-driven rain creates stucco failure patterns not common in other markets. Hairline cracks expand, lath corrodes, the scratch coat loses bond, and water finds its way to the CMU or frame substrate beneath — where it begins attacking rebar and framing before any exterior sign of failure is visible.
The standard response — elastomeric paint or a surface coat — seals the crack from the outside while trapping moisture in the wall cavity. That moisture migrates to the path of least resistance, which is usually behind a window frame or at a structural penetration, and begins driving structural damage from inside.
Florida SB 4-D (2022) includes the building envelope — windows, exterior walls, and the stucco system — in the milestone inspection scope. At 25-year coastal or 30-year inland thresholds, stucco failures documented in a milestone inspection report require a licensed GC permit, substrate repair, and a compliant re-application using Miami-Dade NOA-approved products. Paint is not a remediation.
Miami-Dade NOA Requirement
Miami-Dade County requires stucco systems on buildings in the High-Velocity Hurricane Zone to carry a Notice of Acceptance (NOA). Products without a valid Miami-Dade NOA cannot be used on permitted building envelope repairs. BAM specifies and installs only NOA-compliant stucco systems.
30/25-Year Thresholds (Not 40)
Coastal buildings (within 3 miles of coast) trigger milestone inspection at 25 years. Inland buildings at 30 years. Building envelope findings — including stucco delamination and lath failure — require a bonded GC permit to close out, not a recoat proposal from a painting contractor.
Three-Coat System Required
Florida Building Code specifies a three-coat stucco application (scratch, brown, finish) on CMU and frame construction in high-wind zones. A single-coat re-skin or elastomeric overcoat does not satisfy FBC requirements for permitted building envelope restoration.
150-Day Repair Deadline
Building envelope findings in a milestone inspection report must be remediated under permit within 150 days of the report date. Engage a bonded GC before the inspection report arrives — scheduling and permit lead time cannot be compressed after the clock starts.
Full Building Envelope Scope
What BAM Delivers on Every Stucco Project
BAM self-performs stucco and building envelope scope — substrate repair, NOA-compliant system application, and engineer-stamped closeout. One bonded GC contract from assessment through final inspection sign-off.
Building Envelope Assessment
Visual inspection, sounding, and moisture probe testing of all exterior stucco elevations. Lath condition, bond failure mapping, crack pattern documentation, and window/door frame sealant evaluation. Photo-documented field report with preliminary scope and budget delivered within 48 hours of site visit.
Stucco Removal & Substrate Repair
Removal of delaminated or bond-failed stucco to the substrate. CMU substrate repair, lath replacement, corrosion treatment of exposed rebar, and moisture barrier installation before new stucco application. Structural CMU or concrete findings coordinated with BAM’s engineer of record.
Three-Coat Stucco System
FBC-compliant three-coat application: scratch coat to prepared substrate, brown coat to plane and thickness specification, and finish coat in specified texture. All products carry valid Miami-Dade NOA for use in the High-Velocity Hurricane Zone. Thickness and application verified at each coat before proceeding.
Crack Repair & Spot Restoration
Routing and sealing of structural cracks, V-cut and pack repair of pattern cracking, and feathering of repair edges to minimize texture transition. Appropriate for buildings where the stucco system is otherwise sound but exhibits localized bond failure or crack infiltration at control joints, windows, or penetrations.
Window & Door Frame Sealant
Removal of failed sealant at all window and door frames, sill pans, and penetrations. Back-rod installation and high-performance sealant application in Miami-Dade NOA-compliant products. Frame and frame-to-stucco interface is the primary water infiltration point on South Florida buildings — BAM includes this in every building envelope scope.
Permitted Closeout Package
BAM pulls all building permits for envelope restoration scope. Miami-Dade building inspection coordination managed by BAM’s project team. Where scope intersects SB 4-D milestone inspection findings, BAM’s licensed structural engineer provides the signed and sealed closeout letter required by Miami-Dade Building Department for recertification acceptance.
Reserve Fund Planning
Stucco Contractor Cost in Miami-Dade
Permitted stucco restoration in Miami-Dade varies by scope type, substrate condition, and building access. The table below reflects BAM’s actual pricing for compliant scope — not elastomeric overcoat proposals that will not satisfy Miami-Dade building permit or milestone inspection closeout requirements.
| Scope Type | Cost Range | Notes |
|---|---|---|
| Crack repair & spot restoration | $8–$18/SF | Localized bond failure; crack density and access drive range |
| Full stucco recoat (single elevation) | $15–$28/SF | Removal, substrate prep, and two-coat re-application |
| Three-coat system (full restoration) | $28–$45/SF | FBC-compliant scratch, brown, finish; NOA products |
| Window / door frame sealant | $18–$45/opening | Per frame; back-rod and NOA sealant; perimeter LF drives cost |
| Parapet stucco restoration | $40–$80/LF | Cap, coping, and face repair combined; height-dependent |
| Full building envelope restoration | $120K–$800K+ | All elevations, substrate repair, sealant; phased scope available |
All ranges reflect permitted, NOA-compliant scope in Miami-Dade and Broward. Elastomeric overcoats applied over failed stucco will not satisfy Miami-Dade building envelope findings regardless of product or warranty.
Need a Building Envelope Scope Before Your Milestone Inspection Deadline?
BAM’s building envelope team is on site within 48 hours. Scope, schedule, and line-item budget delivered before your board vote — with phased options for reserve fund planning and occupied buildings.
Request a Stucco Scope AssessmentWhy It Matters
Painting Contractor vs. Bonded GC: What Miami-Dade Building Envelope Repair Requires
| Requirement | Painting / Coating Contractor | BAM (Bonded GC) |
|---|---|---|
| Can pull building envelope permit | No | Yes |
| Installs Miami-Dade NOA-compliant stucco | Rarely | Yes |
| Performs structural substrate repair | No | Yes |
| Licensed structural engineer on staff | No | Yes |
| Engineer-stamped closeout documentation | No | Yes |
| Miami-Dade recertification closeout accepted | No | Yes |
HOA boards and property managers who accept elastomeric overcoat proposals in response to building envelope findings face the same outcome consistently: county inspection rejects the closeout, retroactive permits are required, and the surface coating must be removed before compliant substrate repair and stucco re-application can proceed. BAM delivers complete building envelope scope — substrate, system, sealant, permit, and engineer-stamped closeout — under one bonded GC contract.
Assessment to Closeout
How BAM Delivers Stucco Restoration for HOA Boards and Developers
48-Hour Building Envelope Assessment
BAM’s team is on site within 48 hours. Visual inspection, sounding, and moisture probe testing of all exterior elevations, including stucco bond, lath condition, control joint integrity, and window/door frame sealant. Photo-documented field notes and preliminary scope delivered before we leave the site.
Board-Ready Scope Package
Full line-item scope, phased schedule, and budget framed for board presentation and reserve fund planning. Elevation-by-elevation breakdown available for large buildings. Where scope intersects an SB 4-D inspection finding, 150-day compliance documentation is included. Phased options for occupied buildings where access must be sequenced by unit or floor.
Permit Submission
BAM pulls all permits under the GC license for building envelope restoration scope. No work begins before permits are issued. Miami-Dade permit tracking and required inspection scheduling managed by BAM’s project team. NOA documentation for all specified stucco products submitted with the permit application.
Substrate Repair and System Application
Stucco removal, lath and moisture barrier installation, CMU or frame substrate repair, and three-coat system application using NOA-compliant products. Each coat inspected to thickness and cure specification before proceeding to the next. Window and door frame sealant replaced in the same mobilization — not scheduled as a separate scope.
Permitted Closeout and Engineer Sign-Off
BAM submits all required inspection documentation to Miami-Dade Building Department and tracks through final sign-off. Where scope intersects SB 4-D structural or envelope findings, BAM’s licensed structural engineer signs and seals the recertification package. The certification letter is delivered to the board at project closeout — ready for your association attorney and reserve fund auditor.
Common Questions
Stucco Contractor Miami-Dade — FAQ
Do I need a permit for stucco repair on a condo building in Miami-Dade?
Yes, for any repair that involves removal and re-application of stucco on a building that required a permit for the original construction. Miami-Dade requires a permit for stucco work on multi-family and commercial buildings, and all products used in the High-Velocity Hurricane Zone must carry a valid Miami-Dade NOA. Surface crack filling and sealant-only work may fall below the permit threshold — confirm the specific scope with BAM during the assessment.
What is a Miami-Dade NOA and why does it matter for stucco?
A Notice of Acceptance (NOA) is Miami-Dade County’s product approval for building materials used in the High-Velocity Hurricane Zone. Stucco systems, sealants, lath, and moisture barriers used on permitted building envelope repairs in Miami-Dade must carry a valid NOA. Products without a current NOA cannot be specified or installed on permitted work — and a non-compliant product used on a permitted project can trigger rejection at the final inspection and require removal and re-application.
Can an elastomeric paint or coating close out a stucco finding on a milestone inspection?
No. A painting contractor applying elastomeric coating cannot pull a building envelope permit and does not deliver a permitted closeout package. If the milestone inspection engineer documents stucco delamination, lath failure, or building envelope deficiency, remediating that finding requires a licensed GC permit, compliant substrate repair, and an engineer-of-record letter at closeout. An elastomeric coat applied over a failed stucco system will be rejected as non-responsive to the finding.
How long does a stucco restoration take on a multi-story condo building?
For a typical mid-rise condo building (8–12 stories, 4 elevations), permitted stucco restoration typically runs 10–18 weeks from permit issuance through final inspection, depending on scope, access conditions, and weather windows. Full permit issuance in Miami-Dade adds 2–4 weeks to that timeline from application submission. BAM provides a phased schedule before mobilization — not an estimate revised week by week during construction.
Does BAM handle both the stucco and the underlying structural repair if the inspection finds both?
Yes. BAM self-performs both the structural concrete and masonry substrate repair and the stucco re-application as a single bonded GC scope under one permit and one contract. Buildings with stucco failures frequently have underlying CMU deterioration or rebar corrosion at lintel locations. Splitting those scopes across two contractors creates coordination gaps, permit conflicts, and inspection sequencing problems. BAM eliminates that by performing both under one contract with one engineer of record.
One Contract. One Engineer. One Closeout Package.
BAM Construction delivers permitted, NOA-compliant stucco restoration and building envelope repair for HOA boards, condo associations, and developers across Miami-Dade and Broward County. Substrate repair and stucco system self-performed. Engineer-stamped closeout delivered to county on your behalf.
Miami-Dade & Broward County • On Site Within 48 Hours • Licensed, Bonded & Insured
