Nassau House Sidewalk Curb Appeal
Client Portal
Confidential client portal for all four parties — HOA · Generator team · Sprinkler team · Brick and Mortar Company. Every field document, every revision, every progress photo lives here and updates automatically with the thread. Weekly reports and day-by-day activity for the record.
Where the project stands, at a glance.
Every metric below is derived from the current Weekly Progress Report and the executed Engineer of Record certifications. This section refreshes with each weekly report cycle.
Kickoff Message · Sept 25, 2026 · from AliShaun N. Baksh, Director of Operations · B.A.M.
Hello Glen, Carlos, and Pete. This is AliShaun Baksh, Director of Operations at B.A.M. — Brick and Mortar Company. The link above is our CRM for all field documentation, progress, and pending inspection approvals — you'll find the record in the portal. Weekly reports and day-by-day entries, in case you've had a rough night. It updates automatically with photos and any revision sent into this thread. All info is confidential; all parties must disclose per job-site requirements in this thread. All CO change orders and agreements must bear all four signatures of the parties involved. Per our meeting earlier today, Sept 25, 2026 — drafting of plans and specs for the Proposal will be carried out by AliShaun / BAM on a 7-day timeline. Generator team will demo and remove all debris demolished, clean area, remove all trip hazards and tape off if necessary. Sprinkler team will trench-cut if necessary. Concrete curbing materials and labor by Brick and Mortar Company. Brick and Mortar Company will carry all cost associated with prep prior to contract execution and deposit — i.e. draft plans, logistics, CRM, etc.
The twelve-phase closeout arc.
Twelve phases from swing-stage install through closeout & warranty. Tap any node to reveal the milestone detail; every phase closed and signed. All work delivered by August 19, 2026.
The paper trail — kickoff through contract.
Kickoff meeting record, draft plans and specs, four-party proposal package, scope-of-work by team, confidentiality terms, and the four-signature change-order protocol. New documents post here the same day they issue into the CRM thread.
Every phase trackable. Every milestone transparent.
Eight phases from kickoff through closeout. Each carries its own scope, responsible team, execution window, and four-signature sign-off protocol where applicable. Progress bars update the day the corresponding CRM entry posts.
Every milestone — from kickoff to closeout — on the record.
Live activity feed for the four parties. Every entry posts the same day the corresponding action happens. Field photos and revisions submitted to this thread appear here automatically.
Closed · Paid in Full · Warranty Active
Monthly Maintenance Building Warranty · Terms Summary
Subscription price $1,337 / month, month-to-month, cancel anytime with 30-day written notice. Covers minor crack repairs, stucco patching, caulking replacement, waterproofing touch-ups, and preventative maintenance across the covered envelope from sub-floor garage sea-level up through FL-03. Structural repairs, storm damage, and code-required 40/50-year recertification work are outside the covered scope and quoted separately. All work performed under the same paper-trail discipline as the primary engagement — CRM documentation, four-signature protocol on any scope adjustment, and workmanship warranty on every completed repair. Full policy document issued on subscription enrollment.
Institutional construction discipline — for a single property.
Brick and Mortar Company applies the same paper-trail rigor to a residential curb replacement that Class-A construction managers apply to a Fortune-500 building. Engineered scope, four-party sign-off protocol, weekly written progress reports, photo documentation into the CRM thread, and a client portal that updates the day the work is performed.
