Nassau House · Sidewalk Curb Appeal · Client Portal
Now Available
Monthly Maintenance Building Warranty — subscription protection for the whole property. Covers minor crack repairs, stucco, caulking, waterproofing, and preventative maintenance. Sub-floor garage sea-level to FL-03. $1,337 /mo
See Terms
Project Kickoff · Sept 25, 2026
Drafting Plans · 7-Day Timeline

Nassau House Sidewalk Curb Appeal
Client Portal

Confidential client portal for all four parties — HOA · Generator team · Sprinkler team · Brick and Mortar Company. Every field document, every revision, every progress photo lives here and updates automatically with the thread. Weekly reports and day-by-day activity for the record.

On Time · On Budget · Institutional Construction Discipline
Current Status
Kickoff · Pre-Contract · Plans in Draft
Project Week
Week 0 · Kickoff
Performance
Drafting
Active Phase
Plans + Specs + Proposal
Blockers
None
Progress Dashboard

Where the project stands, at a glance.

Every metric below is derived from the current Weekly Progress Report and the executed Engineer of Record certifications. This section refreshes with each weekly report cycle.

Kickoff Meeting
100%
Sept 25, 2026 · site walk complete · scope aligned across all four parties
Drafting Timeline
7 days
Plans + specs + proposal drafted by AliShaun · BAM · target Oct 2
Signatories Required
4 parties
Every CO + agreement must carry all four signatures — Glen · Carlos · Pete · BAM
Project Progress
5%
Kickoff logged · drafts in progress · pre-contract phase
✉

Kickoff Message · Sept 25, 2026 · from AliShaun N. Baksh, Director of Operations · B.A.M.

Hello Glen, Carlos, and Pete. This is AliShaun Baksh, Director of Operations at B.A.M. — Brick and Mortar Company. The link above is our CRM for all field documentation, progress, and pending inspection approvals — you'll find the record in the portal. Weekly reports and day-by-day entries, in case you've had a rough night. It updates automatically with photos and any revision sent into this thread. All info is confidential; all parties must disclose per job-site requirements in this thread. All CO change orders and agreements must bear all four signatures of the parties involved. Per our meeting earlier today, Sept 25, 2026 — drafting of plans and specs for the Proposal will be carried out by AliShaun / BAM on a 7-day timeline. Generator team will demo and remove all debris demolished, clean area, remove all trip hazards and tape off if necessary. Sprinkler team will trench-cut if necessary. Concrete curbing materials and labor by Brick and Mortar Company. Brick and Mortar Company will carry all cost associated with prep prior to contract execution and deposit — i.e. draft plans, logistics, CRM, etc.

CRM Docs
Construction Timeline · v2

The twelve-phase closeout arc.

Twelve phases from swing-stage install through closeout & warranty. Tap any node to reveal the milestone detail; every phase closed and signed. All work delivered by August 19, 2026.

Current Phase
Document Register

The paper trail — kickoff through contract.

Kickoff meeting record, draft plans and specs, four-party proposal package, scope-of-work by team, confidentiality terms, and the four-signature change-order protocol. New documents post here the same day they issue into the CRM thread.

Phase-by-Phase Progress

Every phase trackable. Every milestone transparent.

Eight phases from kickoff through closeout. Each carries its own scope, responsible team, execution window, and four-signature sign-off protocol where applicable. Progress bars update the day the corresponding CRM entry posts.

PHASE 01
Complete
Kickoff · Site Walk
Kickoff meeting on-site Sept 25, 2026. All four parties present (Glen · Carlos · Pete · AliShaun / BAM). Scope aligned. CRM portal issued.
Sept 25, 2026 · CRM issued
PHASE 02
In Progress
Plans + Specs + Proposal
Drafting by AliShaun / BAM on 7-day timeline. Sidewalk and curb layout drawings, concrete mix spec, control joint layout, four-party proposal package.
Wk 1 · Target Oct 2, 2026 · BAM carries pre-contract cost
PHASE 03
Pending
Contract Execution + Deposit
Master contract signed by all four parties. Deposit collected. Pre-contract cost reconciled. Notice-to-proceed issued.
Wk 2 · 4-signature rule applies
PHASE 04
Pending
Generator Team · Demo
Generator team demolishes existing curb, removes debris, clears trip hazards, tapes off staging as necessary. Site handed over ready for sprinkler work.
Wk 2 · Generator team scope
PHASE 05
Pending
Sprinkler Team · Trench Cut
Sprinkler team trench-cuts as required for utility relocation, sleeves, or line protection ahead of new curb. Coordinated with BAM layout.
Wk 2 · Sprinkler team scope · conditional
PHASE 06
Pending
Sub-Base · Forms · Rebar
Sub-base grade + compact. Curb forms set to grade with cross-slope for drainage. Rebar/dowels placed per plan. QA/QC prior to pour.
Wk 3 · BAM scope
PHASE 07
Pending
Concrete Curb Pour · BAM
Concrete curbing materials and labor by Brick and Mortar Company. Pour, finish, tool control joints, apply curing compound per spec.
Wk 3 · BAM materials + labor
PHASE 08
Pending
Cure · Punch · Closeout
Cure per spec. Backfill / restore adjacent turf. Punch list with all four parties. Completion & Warranty Agreement issued for four-party signature. Warranty active.
Wk 4 · 4-signature closeout
Project Activity Log · Kickoff Forward

Every milestone — from kickoff to closeout — on the record.

Live activity feed for the four parties. Every entry posts the same day the corresponding action happens. Field photos and revisions submitted to this thread appear here automatically.

Sept 25
Kickoff Meeting · Site Walk
Kickoff meeting on-site with Glen, Carlos, Pete, AliShaun (BAM). Scope aligned. CRM portal issued to all four parties.
Complete
Sept 25
CRM Portal · Access Issued
Confidential client portal live for the four parties. Auto-updates with photos and every revision sent into the thread.
Issued
Sept 25
4-Signature Protocol · Established
All CO change orders and agreements must bear all four signatures — Glen · Carlos · Pete · BAM. Locked into the CRM workflow.
Established
Sept 26
Site Survey & Measure
Field measurement of curb linear feet, adjacent utility layout, and trip-hazard catalog for demo scope. Underway.
In Progress
Sept 26 – Oct 2
Drafting Plans + Specs + Proposal
AliShaun / BAM drafts the sidewalk curb plan set, concrete specification, and four-party proposal. 7-day timeline. Pre-contract cost carried by BAM.
In Progress
TBD
Four-Party Review & Contract Signature
Proposal circulated for four-party review. Master contract executed on acceptance. Deposit collected. Pre-contract cost reconciled.
Scheduled
TBD
Generator Team · Demo & Debris
Existing curb demolition. Trip hazards cleared. Debris removed. Area cleaned and taped-off as necessary. Handoff to sprinkler team.
Scheduled
TBD
Sprinkler Team · Trench Cut (if req'd)
Trench cuts for utility relocation or sleeves ahead of new curb pour. Conditional on layout review.
Scheduled
TBD
Sub-Base · Forms · Rebar (BAM)
Sub-base compaction, form set to grade with cross-slope, rebar and dowels per plan. QA/QC prior to pour.
Scheduled
TBD
Concrete Curb Pour (BAM)
BAM materials + labor. Pour, finish, control joints, curing compound per specification.
Scheduled
TBD
Punch List · Final Inspection
Punch list walked with Glen · Carlos · Pete · BAM. Any items resolved. Inspection signed and filed.
Scheduled
TBD
Completion & Warranty Agreement
Closeout packet issued for four-party signature. Balance collected. Workmanship warranty active. Prior tower-restoration warranty remains in force.
Scheduled
Repeat Customer · Prior Engagements
Nassau House · Tower Restoration Archive
Tower #5 & Tower #6 (East Facing) · May 27 – Aug 19, 2026
Closed · Paid in Full · Warranty Active
Scope
Tower #5 + #6 East
Duration
5 weeks
Paid In Full
$21,340.00
Warranty
Active

Monthly Maintenance Building Warranty · Terms Summary
Subscription price $1,337 / month, month-to-month, cancel anytime with 30-day written notice. Covers minor crack repairs, stucco patching, caulking replacement, waterproofing touch-ups, and preventative maintenance across the covered envelope from sub-floor garage sea-level up through FL-03. Structural repairs, storm damage, and code-required 40/50-year recertification work are outside the covered scope and quoted separately. All work performed under the same paper-trail discipline as the primary engagement — CRM documentation, four-signature protocol on any scope adjustment, and workmanship warranty on every completed repair. Full policy document issued on subscription enrollment.

The BAM Doctrine

Institutional construction discipline — for a single property.

Brick and Mortar Company applies the same paper-trail rigor to a residential curb replacement that Class-A construction managers apply to a Fortune-500 building. Engineered scope, four-party sign-off protocol, weekly written progress reports, photo documentation into the CRM thread, and a client portal that updates the day the work is performed.

Traceable
Every phase carries a document reference. Every change order is engineered and signed off before execution.
Verified
Every critical milestone is inspected and countersigned by the Engineer of Record before the next draw releases.
Transparent
Weekly progress reports include every day worked, every incident logged, every scope adjustment recorded — with dimensions.
Delivered
On Time. On Budget. The motto locked into every contract, every quote, every signature — into every project we accept.
On Time · On Budget
Confidential Client Portal · Access limited to the four contracted parties (Glen · Carlos · Pete · Brick and Mortar Company) and the Engineer of Record. All information disclosed per job-site requirements. This page updates the day the corresponding CRM entry posts. © 2026 Brick and Mortar Company LLC.