Milestone Inspection Contractor • Miami-Dade & Broward
Recertification Contractor Miami
30-Year Milestone Inspection
BAM Construction is a licensed, bonded Miami recertification contractor delivering engineer-stamped structural assessments, permitted repair scope, and county-compliant closeout documentation for 30-year and 25-year milestone inspections in Miami-Dade and Broward County.
Florida’s recertification threshold is no longer 40 years. It is 30 years inland and 25 years coastal. For buildings constructed between 1993 and 2001, the inspection is not approaching—for most, it is already due.
Request a Scope AssessmentLicensed GC • Engineer-Stamped Closeout • Miami-Dade & Broward
What Changed in 2022
The 40-Year Rule Is Gone. Most Contractors Haven’t Updated.
Florida’s Senate Bill 4-D (2022) passed in direct response to the Champlain Towers South collapse in Surfside—98 deaths in a 12-story oceanfront building with years of documented concrete deterioration. SB 4-D replaced the prior 40-year rule with mandatory milestone inspections at 30 years inland and 25 years coastal.
Any contractor, property manager, or engineer still referencing the “40-year recertification” is operating on a standard Florida law eliminated four years ago. For an HOA board relying on their guidance, that gap is a direct compliance liability.
For buildings constructed between 1993 and 2001, the milestone inspection is not approaching. For most, it is already due. BAM works exclusively on the correct legal framework, with the bonded GC capacity and engineer-stamped documentation process that county compliance requires.
Full-Scope Recertification
What a Recertification Scope Actually Covers
The milestone inspection framework addresses the full structural and electrical envelope—not just visible exterior. BAM self-performs all trades under one bonded GC contract.
Structural Inspection & Permit
Phase 1 visual assessment coordination, Phase 2 investigation management, structural permit application by licensed bonded GC. Only a bonded GC can pull the structural permit for repair scope.
Concrete Spalling Repair
Full delamination removal to sound concrete, rebar cleaning and corrosion inhibitor application, structural repair mortar matched to existing mix. Executed by BAM’s own crews to ICRI standards.
Balcony & Catwalk Restoration
Slab-edge reconstruction, rebar treatment, deck membrane, and railing anchor replacement under structural permit. The most common Phase 2 finding in Miami-Dade coastal buildings.
Deck Waterproofing & Coating
Pedestrian-grade traffic coatings and deck membrane systems specified for South Florida UV, thermal cycling, and foot traffic. Membrane selection coordinated with the structural engineer’s scope.
Electrical Inspection Coordination
SB 4-D requires both structural and electrical milestone inspection. BAM coordinates the electrical inspection with a licensed Florida electrical engineer and manages electrical repair scope under the GC contract.
Engineer-Stamped Closeout Package
Permit finals, engineer certification letter, Phase 2 cross-reference, and county compliance closeout letter delivered in the format Miami-Dade Building Department requires to formally close the recertification file.
2026 Pricing
Recertification Scope Cost Ranges: Miami-Dade
Recertification costs are driven by Phase 2 findings, building height, access requirements, and permit classification. The following ranges reflect current scope pricing across Miami-Dade and Broward.
| Scope Type | Cost Range | Notes |
|---|---|---|
| Phase 1 inspection coordination | $2,500–$5,000 | Includes licensed engineer site visit + report |
| Phase 2 structural investigation | $4,000–$12,000 | Testing, analysis, engineer repair specification |
| Surface spalling repair (minor) | $15–$25 / SF | Sound concrete, no rebar exposure |
| Spalling repair with rebar treatment | $25–$50 / SF | Rebar cleaning, inhibitor, structural mortar |
| Slab-edge reconstruction | $40–$65 / SF | Formed concrete; requires structural permit |
| Full balcony restoration (20–30 units) | $80,000–$180,000 | Includes permits, engineering, phased execution |
| Railing system replacement | $85–$200 / LF | Anchor into sound concrete; engineer-stamped calcs |
| Electrical inspection + minor panel work | $3,500–$9,000 | Common areas, service entrance, distribution panels |
Ranges reflect 2026 South Florida market conditions. Final scope and pricing require site assessment and Phase 2 engineer findings. Phased programs available for reserve fund management.
The County Doesn’t Close the
Notice.
Your Closeout Package Does.
Only a bonded GC with a licensed engineer of record attached to the permit can produce the engineer-stamped documentation package Miami-Dade requires to formally close the recertification file.
Request a Scope AssessmentContractor Comparison
Specialty Sub vs. Bonded GC: What County Recertification Actually Requires
Most recertification bids come from specialty concrete subs, inspection firms, or waterproofing contractors. They can complete repairs. They cannot close the county file.
| Requirement | Specialty Sub / Inspector | BAM (Bonded GC) |
|---|---|---|
| Pull structural permit | No | Yes |
| Licensed engineer of record on permit | Sometimes | Yes |
| Phase 2 investigation management | Sometimes | Yes |
| Self-perform structural concrete scope | Rarely | Yes |
| Electrical inspection coordination | No | Yes |
| Engineer-stamped permit drawings | No | Yes |
| County-accepted closeout package | No | Yes |
| Formally closes recertification notice | No | Yes |
A Hollywood 38-unit condo association hired a specialty concrete firm in 2023. Six weeks later the work was complete. Miami-Dade rejected the closeout package—no structural permit, no field inspections by the engineer of record, no acceptable certification letter. BAM was retained to remediate the documentation. The cost: $28,000 and 14 weeks, added to a project the board considered finished. The original specialty firm’s bid was $11,000 less than BAM’s.
Notice to Closeout
BAM’s Recertification Process: 8 Steps to County Closeout
Common Questions
Recertification Contractor Miami: FAQ
What is the 30-year recertification in Miami?
Miami’s 30-year recertification is a mandatory structural and electrical inspection for buildings three stories or taller, triggered at 30 years for inland buildings constructed in 1993 or later. Florida’s SB 4-D (2022) established this standard statewide. Coastal buildings within 3 miles of the shoreline have a 25-year threshold. All buildings must re-certify every 10 years after the initial milestone inspection. The prior 40-year standard is no longer in effect for buildings constructed after those dates.
What does a Miami recertification contractor do?
A Miami recertification contractor manages the full compliance sequence: coordinating the Phase 1 structural and electrical inspection, managing the Phase 2 investigation if substantial deterioration is found, pulling the structural permit for repair scope, executing the permitted repairs, and delivering the engineer-stamped closeout documentation package that Miami-Dade or Broward Building Department requires to formally close the recertification notice. A bonded general contractor license is required to pull the structural permit and execute structural repair scope.
How long does Miami building recertification take?
For a building with moderate Phase 2 findings, the full process from Phase 1 inspection to county closeout runs 16–24 weeks. Phase 1 inspection and report: 2–4 weeks. Phase 2 investigation (if required): 3–5 weeks. Structural permit approval: 4–8 weeks in Miami-Dade. Repair execution: 6–12 weeks depending on scope. County closeout documentation: 1–2 weeks. BAM manages the full sequence against the 90-day and 150-day statutory windows.
What happens if a Miami condo fails to certify on time?
Miami-Dade County can issue fines for non-compliance with the milestone inspection deadline. For buildings where the Phase 2 report documents a structural hazard, the county retains authority to post an “Unsafe Structure” notice, which can trigger occupancy restrictions and building closure. Partial compliance—completing the inspection but not the repairs—does not close the county notice. Only the full engineer-stamped closeout package closes the file.
Does building recertification require a general contractor?
Yes, for any structural repair scope. Florida law requires a licensed general contractor to pull structural permits above specific thresholds. An inspection-only engineer or specialty concrete sub cannot pull a structural permit, cannot legally execute the permitted repair scope, and cannot produce the engineer-stamped documentation package required for county closeout. An HOA association that hires an unlicensed or specialty-only firm for structural recertification scope will find the work unpermitted and the county notice still open.
What does a recertification closeout package include?
The Miami-Dade recertification closeout package includes: the Phase 2 structural investigation report, engineer-stamped permit drawings showing all repair scope, construction inspection records from field visits during the repair work, the engineer of record’s final certification letter, permit finals from the county building inspector, and the county compliance closeout letter. This package goes into the building’s permanent record and is the legal documentation that the milestone inspection requirement has been satisfied.
The Notice
Stays Open
Until the Closeout Package Closes It.
BAM Construction is a licensed, bonded Florida GC with active DOD contract performance, licensed structural engineers on staff, and self-performed concrete and balcony restoration crews. We manage the full recertification sequence—Phase 1 through county closeout—for HOA boards across Miami-Dade, Broward, and Palm Beach County.
Licensed Florida GC • Bonded • Engineer-Stamped Closeout • Miami-Dade & Broward
